Method for multi 您所在的位置:网站首页 华硕笔记本怎样刷boys Method for multi

Method for multi

#Method for multi| 来源: 网络整理| 查看: 265

[1] 刘志雄, 王少梅. 基于粒子群算法的并行多机调度问题研究[J]. 计算机集成制造系统, 2006, 12(2): 183-187. LIU Zhi-xiong, WANG Shao-mei. Research on parallel machines scheduling problem based on particle swarm optimization algorithm [J]. Computer Integrated Manufacturing Systems, 2006, 12(2): 183-187. [2] 贺仁杰, 谭跃进. 具有时间窗口约束的并行机床调度问题研究[J]. 系统工程, 2004, 22(5): 18-22. HE Ren-jie, TAN Yue-jin. On parallel machine scheduling problem with time windows [J]. Systems Engineering, 2004, 22(5): 18-22. [3] 胡大勇, 姚振强. 调整时间与顺序相关的等同并行机调度[J]. 机械工程学报, 2011, 47(16): 160-165. HU Da-yong, YAO Zhen-qiang. Identical parallel machines scheduling with sequence-dependent setup times [J]. Journal of Mechanical Engineering, 2011, 47(16): 160-165. [4] GUPTA J N D. Two-stage hybrid flow shop scheduling problem [J]. Journal of the Operational Research Society, 1988, 39(4): 359-364. [5] OGUZ C, LIN B M T, EDWIN C T C. Two-stage flow shop scheduling with a common second-stage machine [J]. Computers & operations research, 1997, 24(12): 1169-1174. [6] HARIRI A M A, POTTS C N. A branch and bound algorithm for the two-stage assembly scheduling problem [J]. European Journal of Operational Research, 1997, 103(3): 547556. [7] 赵月, 胡玉梅. 求解可重入并行机调度的混台禁忌搜索算法[J].计算机应用, 2012, 32(9): 2451-2454. ZHAO Yue, HU Yu-mei. Hybrid tabu search for scheduling reentrant jobs on parallel machines [J]. Journal of Computer Applications, 2012, 32(9): 2451-2454. [8] 张洁, 张朋, 刘国宝. 基于两阶段蚁群算法的带非等效并行机的作业车间调度[J]. 机械工程学报, 2013, 49(6): 136-144. ZHANG Jie, ZHANG Peng, LIU Guo-bao. Two-stage ant colony algorithm based job shop scheduling with unrelated parallel machines [J]. Journal of Mechanical Engineering, 2013, 49(6): 136-144. [9] 陈亮, 王世进, 周炳海. 柔性作业车间调度问题的集成启发式算法[J]. 计算机工程, 2008, 34(1): 256-258. CHEN Liang, WANG Shi-jin, ZHOU Bing-hai. Integrated heuristic algorithm for flexible job-shop scheduling problems [J]. Computer Engineering, 2008, 34(1): 256-258. [10] 庄新村, 卢宇灏, 李从心. 基于遗传算法的车间调度问题[J]. 计算机工程, 2006, 32(1): 193-194. ZHUANG Xin-cun, LU Yu-hao, LI Cong-xin. Solving job shop scheduling problem by genetic algorithm [J]. Computer Engineering, 2006, 32(1): 193-194. [11] ZHENG D Z, WANG L. An effective hybrid heuristic for flow shop scheduling [J]. The International Journal of Advanced Manufacturing Technology, 2003, 21(1): 38-44.



【本文地址】

公司简介

联系我们

今日新闻

    推荐新闻

    专题文章
      CopyRight 2018-2019 实验室设备网 版权所有